Customization: | Available |
---|---|
After-sales Service: | One Year |
Warranty: | One Year |
Still deciding? Get samples of US$ 2/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Quick Details:
Item | ABS plastic M1/2 Diverter shower accessories Three Ways Diverter valve |
Usefulness | ABS plastic diverter with handshower holder |
Material | ABS plastic |
Surface | Chrome Plated |
size | M1/2 |
Features | with ceramic cartridge |
Package: | bubble bag / Color Box |
Descriptions:
Product Name | ABS plastic M1/2 Diverter shower accessories Three Ways Diverter valve |
Applications |
ABS plastic M1/2 Diverter shower accessories Three Ways Diverter valve Its for shower kit water seperate diverter, its for handshower holder. |
Material | ABS plastic |
Functions |
three ways water seperate hand shower holder |
Surface Treatment | Chrome/Nickle plated |
Installation | Tools-free |
Main dimension |
1). F3/4"-M1/2"-M1/2" |
Features |
1. with ceramic cartrige 2. with handshower holder 3. three ways water seperate, easy for water flow out. |
Combination Parts |
Combination parts of shower set 01 brass diverter+hand shower heads |
Chrome Test |
Chrome surface pass Salt Spray Test of CASS 4 hours. CASS 8 hours can be available as customized. |
Package |
normal package: bubble bag Design package: color box customized package: double blister |
Water-flowing Rate |
Bathroom Showerhead 3 Setting color change LED Hand Shower Head 1). Water-flowing rate can be control under 1.5GPM with water pressure from 20-80PSI. 2). Water-flowing rate can be control under 2.0GPM with water pressure from 20-80PSI. 3). Water-flowing rate can be control under 2.5GPM with water pressure from 20-80PSI. |
Place of Original | Zhejiang Province, China(Mainland). |
Service OEM | We accept Print your logo on products and color box for free. |
HS code | 84818090 |
Quality control system | phase 1. Before production qulity control : 1). First article Specification & Quality standard statement. 2). Pre-production quality approval Phase 2. During Production quality control: 3). Raw material & Outsourced Components quality control. 4). During production quality checking (every production process node. 5). 100% quality checking before packing. Phase 3. Before shipment quality control: 6). Pre-shipment Random quality checking. 7). Container loading planning & process control. |